Bedford CF-UK Message Board Logo [Home] [Search] [FAQ]
Bedford CF-UK Message Board > CF Blog Spot > Getting through the work list 2013.
[Private Message] [Register] [Profile] [Member list] [Log-in]
Who's Online:
There are 0 member(s), and 1 guest(s) online.
 
[Printable Version] [Post Reply]
Author Message
Anon
Deleted
Posts :
Location :
Status    : Offline

Getting through the work list 2013.

Hi to all,

This week I started of by drying out the inside and finding new roof leaks and sealing them up, seems to have worked no more drips.
Next job was to rewire some of the battery lighting and repair the base of one of the top cuboards, damaged by water.
The outside repairs have had to stop due to the weather but still have a few workshop jobs to keep me away from having to sit my test for driving the hoover.
Just finishing a recon on a cylinder head I accquired, which had to be retapped for all the manifold studs due to missing bolts, so is now all metric threads.
And I still have the rest of the engine block and crankshaft to recon, have to see how the money goes for all that work.
The work to adapted to a stromberg 150 carb is still to be completed, just how much of a good thing that will be is yet to be seen.

Doug.

----------------------

Tue 08 Jan 2013 @ 20:09 Edit this messageQuote this messagePMQuote this message
Time in GMT
[Post Reply]
New posts since your last visit Administrative Functions: Open/Close/Delete Thread / Move Thread
Old post

Forum Jump:

Back to the CF-UK Homepage ][ Email CF-UK

Powered by FunkBoard vCF0.74c